Tumpen-Habichen hydroelectric plant
Services
Design
Visualization
Project management
Year
2022
The Tumpen-Habichen power plant uses the downward gradient of the Ötztaler Ache between Tumpen and Habichen.
The execution of a hydropower plant including a doping power plant, desander plant and fish ladder was carried out in the execution planning. With an annual work potential of 63 gigawatt hours, up to 15,000 households are supplied with clean electricity. The 3D planning of the plant was carried out with Autodesk Revit in BIM ready implementation.